Full restoration works to the 200-year-old bell tower showing signs if its age through deterioration and exposure to the weather with severe rot. We made specialist repairs to the timber frame, new lead word and decorations to give it a new lease of life. To enable us to carry out the works we must have a steel frame for the bell tower made up and a crane to lift it from its position enabling us to carry out works. Once complete and given the clients seal of approval we re-lifted back into position.